Installation energy resilience master plans

ReleasedFA-25-03118 · FOIA · Released Aug 10, 2026

A request for installation energy resilience master plans covering depot and arsenal facilities, including microgrid feasibility studies prepared between 2022 and 2024.

Command
Army Materiel Command (AMC)
Requested by
Energy Transition Review
Pages posted online
1
Exemptions applied

None. The record was released in full.

Released documentsEach block marks the amount of information deleted, with the exemption asserted shown at the place of deletion.

Installation energy resilience master plan, depot and arsenal facilities

Page 1 of 1

This master plan establishes energy resilience objectives for depot and arsenal facilities through fiscal year 2030. Each installation is assessed against a fourteen-day critical mission load requirement, with backup generation, thermal storage, and islanding capability evaluated as a combined portfolio rather than as separate line items.

Microgrid feasibility studies completed between 2022 and 2024 covered eleven installations. Nine studies concluded that a partial microgrid serving designated critical facilities is achievable within existing distribution infrastructure. Two studies recommended distribution upgrades in advance of any islanding capability, on the basis of feeder age rather than load growth.

Metered consumption data supporting these findings is published in the annual energy report and is releasable in full. No portion of this plan was withheld: the record is released in its entirety.